Blocking Dirty Oil Infrastructure

In Setback for Enbridge, PUC Rules Line 3 Review is Inadequate

Whether it moves by pipeline, by rail, or by tanker, tar sands and other oil is polluting, highly combustible, and dangerous to communities and our climate. In order to avert the worst of the climate crisis and protect our communities from devastating explosions and oil spills, we must stop the industry from building any new oil infrastructure. After more than a decade of advocacy, legal challenges, and organizing in partnership with local communities along the pipeline route and across the country, we successfully blocked the proposed Keystone XL tar sands pipeline. Now we are continuing to apply those same tools to winning fights against other pipelines, oil train terminals, and oil export facilities across the country.


Read more:

Watch:





October 14, 2024

Nashville, Tennessee — The U.S. Court of Appeals for the Sixth Circuit has paused two essential water permits for the proposed Cumberland Gas Pipeline, which would cut through parts of Dickson, Houston, and Stewart Counties in Middle Tennessee. The stays, which freeze the permits until the court issues final rulings sometime next year, were issued late Friday afternoon and halt pipeline construction activities.

August 7, 2024

Denver, CO — Today, the Colorado Energy and Carbon Management Commission (ECMC) approved a Comprehensive Area Plan (CAP) for an over 150 fracking well expansion at Lowry Ranch, handing a victory to the oil and gas industry despite years of pushback and advocacy from Aurora residents and environmental advocates. 

June 13, 2024

Today Sierra Club and Public Citizen sued FERC for its approval of ONEOK’s Saguaro Connector Pipeline that would export massive amounts of methane gas from West Texas to Mexico for further transport, liquefaction, and export primarily to Asia.

June 11, 2024

Today, despite ten years of fierce community opposition and countless failures and violations, the Federal Energy Regulatory Commission (FERC) granted approval to allow the fracked gas Mountain Valley Pipeline to go into service.

May 3, 2024

The Federal Trade Commission has uncovered efforts by former CEO of Pioneer Natural Resources Scott Sheffield to collude with OPEC in order to increase the price of oil through agreed up cuts in production. The conduct was discovered as part of an investigation into the $64 billion acquisition of Pioneer by Exxon Mobil, which FTC says it will not reject as long as Sheffield is not named to the board.

April 30, 2024

NASHVILLE, Tenn. — The Southern Environmental Law Center, on behalf of the Sierra Club and Appalachian Voices, has filed a lawsuit challenging the Federal Energy Regulatory Commission’s decision to approve the 32-mile Cumberland Pipeline — a dangerous and unnecessary methane gas pipeline that will do long-lasting damage to the climate, Tennessee Valley Authority customers, local waterways, and nearby communities.

April 23, 2024

WASHINGTON, D.C. — Late yesterday, a number of conservation groups filed a petition in the U.S. Court of Appeals for the D.C. Circuit challenging a Federal Energy Regulatory Commission decision to extend the Certificate of Public Convenience and Necessity for Mountain Valley Pipeline’s Southgate Project.

April 12, 2024

WASHINGTON — The Biden administration gave formal approval Monday for a huge oil export project in Texas known as Sea Port Oil Terminal (SPOT), despite widespread opposition because of its impacts to public health and safety, the climate, and the environment.

April 4, 2024

NEW ORLEANS, La. — Today, the Fifth Circuit Court of Appeals upheld the unsound approval of a massive deepwater oil export facility off the Gulf Coast near Brazoria County, Texas.

March 21, 2024

Livestream recording available here