Blocking Dirty Oil Infrastructure

In Setback for Enbridge, PUC Rules Line 3 Review is Inadequate

Whether it moves by pipeline, by rail, or by tanker, tar sands and other oil is polluting, highly combustible, and dangerous to communities and our climate. In order to avert the worst of the climate crisis and protect our communities from devastating explosions and oil spills, we must stop the industry from building any new oil infrastructure. After more than a decade of advocacy, legal challenges, and organizing in partnership with local communities along the pipeline route and across the country, we successfully blocked the proposed Keystone XL tar sands pipeline. Now we are continuing to apply those same tools to winning fights against other pipelines, oil train terminals, and oil export facilities across the country.


Read more:

Watch:





June 29, 2018

Today, Mountain Valley Pipeline (MVP) announced it is suspending construction activities in Southwest Virginia. The halt comes after citizen advocacy groups reported dozens of suspected water quality violations to the Virginia Department of Environmental Quality (DEQ).

June 26, 2018

Today, a coalition of environmental advocates filed a petition for judicial review that could again halt construction of the fracked gas Mountain Valley Pipeline

June 21, 2018

Today, the Fourth Circuit Court of Appeals granted a stay of a crucial permit that the fracked gas Mountain Valley Pipeline (MVP) needs to build across waterways.

June 15, 2018

The West Virginia Department of Environmental Protection (DEP) issued a Notice of Violation (NOV) to the fracked gas Mountain Valley Pipeline following an investigation on June 6, 2018

June 15, 2018

Virginia residents have submitted more than 3,000 comments to their Water Control Board demanding the Nationwide Permit 12 for the fracked gas Atlantic Coast and Mountain Valley pipelines be revoked.

June 6, 2018

Yesterday, attorneys for the Sierra Club and Appalachian Mountain Advocates (Appalmad) appeared before the Virginia Supreme Court to present oral arguments in Sierra Club v. State Corporation Commission.

May 31, 2018

The Federal Energy Regulatory Commission (FERC) approved Florida Southeast’s planned spur off the Sabal Trail Pipeline to supply a planned fracked gas-burning plant in Okeechobee, FL.

May 30, 2018

Today, the Sierra Club and the FreshWater Accountability Project filed comments with the Ohio Environmental Protection Agency on the water quality permit for Shell’s Falcon ethane pipeline.

May 23, 2018

The Army Corps of Engineers (Corps) has indefinitely suspended portions of a permit required for construction of the fracked gas Mountain Valley Pipeline (MVP)

May 22, 2018

A coalition of environmental advocates filed a motion for stay, asking the United States Court of Appeals for the Fourth Circuit to put an immediate stop to the construction across waterways of the fracked gas Mountain Valley Pipeline